- SUMMARY
- OCCUPANCY
- Floor Loadings
- Floor Voids
- Structure
- Internal Office Finishes
- Reception
- Toilets and Showers
- Cycling Facilities
- Lifts
- Mechanical Installations
- Design Parameters
- EPC
SUMMARY
NEWLY RE-MODELLED AND ENLARGED RECEPTION
2 X NEW 8-PERSON PASSENGER LIFTS
FULL ACCESS RAISED FLOORS
VRV AIR CONDITIONING
NEW LED LIGHTING
NEW WC’S
FULL CYCLE STORAGE
FACILITY WITH DEDICATED ENTRANCE
LOCKER FACILITIES
4 X SHOWER / CHANGING FACILITIES
OCCUPANCY
Means of escape density:
1 person/6 m2
1 person/6 m2
Occupation density:
1 person/10 m2
1 person/10 m2
Lift Provision:
Two x 8-person passenger lifts
Two x 8-person passenger lifts
Sanitary provision:
1 person/10 m2
1 person/10 m2
Floor Loadings
Lower Ground Floor:
5.00 kN/m2 + 1.00 kN/m2 for partitions
5.00 kN/m2 + 1.00 kN/m2 for partitions
Ground Floor:
5.00 kN/m2 + 1.00 kN/m2 for partitions
5.00 kN/m2 + 1.00 kN/m2 for partitions
First to Fifth:
5.00 kN/m2 + 1.00 kN/m2 for partitions
5.00 kN/m2 + 1.00 kN/m2 for partitions
Roof:
2.5 kN/m2 to accessible terrace areas and 5.0kN/m2 over the roof plant area.
2.5 kN/m2 to accessible terrace areas and 5.0kN/m2 over the roof plant area.
Raised floors, ceiling and services equipment
Lower Ground
0.50kN/m2
0.50kN/m2
Ground floor to Fifth floor
1.15 kN/m2
1.15 kN/m2
Floor Voids
Raised Floor zone:
Circa 38mm clear void
Circa 38mm clear void
Services Ceiling Zone:
Circa 700mm clear void with areas of downstand beams
Circa 700mm clear void with areas of downstand beams
Structure
Basement
Reinforced concrete frame with precast concrete floors
Reinforced concrete frame with precast concrete floors
Lower Ground to Sixth floor
Steel frame with precast concrete floors
Steel frame with precast concrete floors
Internal Office Finishes
Walls:
Emulsion paint finished plaster
Emulsion paint finished plaster
Floors:
500mm x 500mm raised access floor tiles, medium grade with magnetic timber floor board providing access to the floor void
500mm x 500mm raised access floor tiles, medium grade with magnetic timber floor board providing access to the floor void
Ceilings:
Emulsion painted plasterboard margin
Concealed grid suspended PPC metal plank system
Emulsion painted plasterboard margin
Concealed grid suspended PPC metal plank system
Windows:
Double Glazed Units refinished internally and externally
Double Glazed Units refinished internally and externally
Light Fittings:
LED lighting designed in accordance with the spirit of CIBSE LG7
LED lighting designed in accordance with the spirit of CIBSE LG7
Doors:
Solid core timber doors
Solid core timber doors
Skirting:
Planted painted MDF skirting
Planted painted MDF skirting
Reception
Walls:
Emulsion paint finished plaster
Shell gris limestone, honed finish
Bespoke timber cladding
Emulsion paint finished plaster
Shell gris limestone, honed finish
Bespoke timber cladding
Floors:
Shell Gris Limestone, honed finish
Shell Gris Limestone, honed finish
Ceilings:
Emulsion painted plasterboard
Emulsion painted plasterboard
Desk:
Block desk in hot rolled steel by Isomi
Block desk in hot rolled steel by Isomi
Toilets and Showers
3 No. superloos and 1 No. accessible superloo per floor
2 No. showers with WC and 1 No. accessible superloo on the ground floor
2 No. showers with WC, 1 No. WC superloo on the lower ground floor
Wall hung white vitreous china WC pans with pipework and cisterns concealed behind IPS panels
Walls:
Porcelain-tiled and emulsion-painted
Porcelain-tiled and emulsion-painted
Floors:
Porcelain tiles
Porcelain tiles
Ceilings:
Emulsion-painted plasterboard with recessed lighting
Emulsion-painted plasterboard with recessed lighting
Hand Basins:
Corian vanity tops
Corian vanity tops
Mirrors:
Wall mounted mirror over each vanity top with concealed fixings and LED feature lighting behind
Wall mounted mirror over each vanity top with concealed fixings and LED feature lighting behind
Cubicles:
Veneer finish full height cubicle system
Black stainless steel ironmongery and accessories
Veneer finish full height cubicle system
Black stainless steel ironmongery and accessories
Cycling Facilities
Secure cycle store accessed via stair with integrated bike slide
30 standard cycle spaces
3 Brompton lockers
Locker room with 18 lockers
4 No. showers with WC and underfloor heating
Lifts
2 x 8-person passenger lifts serving Lower Ground to 5th Floor
Access to 6th floor via 1 No. passenger Lift
Walls:
Back painted glass Smoked mirror to rear wall
Hot rolled steel cladding panels
Back painted glass Smoked mirror to rear wall
Hot rolled steel cladding panels
Floor:
Shell Gris Limestone, honed finish
Shell Gris Limestone, honed finish
Ceiling:
Backlit acid etched perspex panel
Backlit acid etched perspex panel
Mechanical Installations
Cooling and Heating
Office Area:
VRF type air conditioning system consisting of ceiling void mounted units located to BCO zoning recommendations
VRF type air conditioning system consisting of ceiling void mounted units located to BCO zoning recommendations
Design Parameters
External Temperatures
Summer:
30°C dry bulb
21.9°C wet bulb
30°C dry bulb
21.9°C wet bulb
Winter:
-4°C saturated
-4°C saturated
Internal Temperatures
Office:
Winter 20°C +/-2°C
Summer 24°C +/-2°C
Winter 20°C +/-2°C
Summer 24°C +/-2°C
Reception:
Winter 20°C +/-2°C
Winter 20°C +/-2°C
Toilets:
Winter 19°C min
Winter 19°C min
Illumination Levels
Office:
300 - 500 lux average illuminance at working plane above FFL
300 - 500 lux average illuminance at working plane above FFL
WCs and showers:
150 - 200 lux average illuminance at floor level
150 - 200 lux average illuminance at floor level
Reception:
150 - 200 lux average illuminance at floor level
150 - 200 lux average illuminance at floor level
Lobbies:
200 lux maintained illuminance at floor level
200 lux maintained illuminance at floor level
Heat Gain Allowance
Lighting:
8 W/m2 office areas
8 W/m2 office areas
Small Power:
25 W/m2 for office area terminal unit sizing
25 W/m2 for office area terminal unit sizing
Occupants:
Sensible – 70 W per person
Latent – 45 W per person
Sensible – 70 W per person
Latent – 45 W per person
Ventilation Rates
Office:
12 litres/s/person + 10% fresh air supply
12 litres/s/person + 10% fresh air supply
WCs:
10 air changes per hour extract
10 air changes per hour extract
EPC
The building has an EPC rating of B (50)